ShanDong Orient HongYe Chemical CO., LTD. second quarter environmental self-monitoring publicity
1. Basic information
Name of enterprise | ShanDong Orient HongYe Chemical CO., LTD | Legal representative | Gao SiHai |
Industry involved | Petrochemical industry | Production cycle | 8000Hours |
Geolocation | East longitude:119º 2′ 35″ North latitude :37º 2′ 59″ | ||
Attn | Wang Zong Jun | Contact details | 15965088070 |
Name of the entrusted testing institution | ShanDong Yida environmental testing Co., LTD |
2.Self-testing scheme
Order number | Pollution source name | Number of outfalls | Test item | Detection mode | Monitoring frequency
|
Remark |
1 | Heating furnace | 9 | PM | Manual monitoring | Once per quarter | Commission inspection |
Sulfur dioxide | ||||||
Oxynitride | ||||||
Blackness | ||||||
2 | Boiler | 1 | Mercury and its compounds | Manual monitoring | Once per quarter | Commission inspection |
Blackness | ||||||
Sulfur dioxide | Automatic testing | |||||
Oxynitride | ||||||
PM | ||||||
Volatile organic compound | Manual monitoring | Once per month | Commission inspection | |||
3 | Hydrogen peroxide oxidation tail gas exhaust cylinder | 1 | Non-methane hydrocarbon | Manual monitoring | Once per quarter | Commission inspection |
4 | Unorganized discharge | Factory boundary | Non-methane hydrocarbon | Manual monitoring | Once per quarter | Comissionm inspection |
PM | ||||||
Benzene | ||||||
Methylbenzene | ||||||
Xylene | ||||||
Sulfuretted hydrogen | ||||||
Ammonia gas | ||||||
Odor concentration | ||||||
5 | Unorganized discharge | In the factory | Sulfur dioxide | Manual monitoring | Once per quarter | Commission inspection |
Oxynitride | ||||||
PM2.5 | ||||||
PM10 | ||||||
Total suspended particulates | ||||||
Mercury and its compounds | ||||||
6 | Unorganized discharge | Aromatics tank area around | Non-methane hydrocarbon | Manual monitoring | Once per quarter | Commission inspection |
7 | Workshop wastewater | 3 | Total arsenic | Manual monitoring | Once per month | Commission inspection |
Total cadmium | ||||||
Total mercury | ||||||
Total nickel | ||||||
Total chromium | ||||||
Hexavalent chromium | ||||||
Total arsenic | ||||||
8 | Noise | 4 | Manual monitoring | Once per quarter | Commission inspection |
3.Self-monitoring results
Sampling time | June 16, 2023 | |||||
Sampling position | Test items | Test results | Standard limit | Information of reaching standard | Discharge method and destination | |
Heating furnace | PM | 6.6 | 10 | Up to the standard | Direct exhaust atmosphere | |
Sulfur dioxide | 6 | 50 | Up to the standard | Direct exhaust atmosphere | ||
Oxynitride | 48 | 100 | Up to the standard | Direct exhaust atmosphere | ||
Blackness | <1 | 1 | Up to the standard | Direct exhaust atmosphere | ||
Sampling time | June 17, 2023 | |||||
Boiler | Mercury and its compounds | 0.008 | 0.03 | Up to the standard | Direct exhaust atmosphere | |
Blackness | <1 | 1 | Up to the standard | Direct exhaust atmosphere | ||
Non-methane hydrocarbon | 30.3 | 60 | Up to the standard | Direct exhaust atmosphere | ||
Sampling time | May 9, 2023 | |||||
Hydrogen peroxide exhaust cylinder | Non-methane hydrocarbon | 4.07 | 60 | Up to the standard | Direct exhaust atmosphere | |
Sampling time | April 14, 2023 | |||||
Unorganized discharge in factory boundary | Non-methane hydrocarbon | 1.36 | 4 | Up to the standard | Direct exhaust atmosphere | |
PM | 0.409 | 1 | Up to the standard | Direct exhaust atmosphere | ||
Benzene | ND | 4 | Up to the standard | Direct exhaust atmosphere | ||
Methylbenzene | ND | 15 | Up to the standard | Direct exhaust atmosphere | ||
Xylene | ND | 15 | Up to the standard | Direct exhaust atmosphere | ||
Sulfuretted hydrogen | 0.008 | 1.5 | Up to the standard | Direct exhaust atmosphere | ||
Ammonia gas | 0.07 | 1.5 | Up to the standard | Direct exhaust atmosphere | ||
Odor concentration | <10 | 20 | Up to the standard | Direct exhaust atmosphere | ||
Sampling time | April 13, 2023 | |||||
Unorganized discharge | Non-methane hydrocarbon | 1.96 | 4 | Up to the standard | Direct exhaust atmosphere | |
Sampling time | June 16, 2023 | |||||
Workshop wastewater | Total arsenic | ND | 0.5 | Up to the standard | Discharge to the company sewage treatment station | |
Total cadmium | ND | 0.5 | Up to the standard | |||
Total mercury | ND | 0.05 | Up to the standard | |||
Total nickel | ND | 0.01 | Up to the standard | |||
Total chromium | ND | 1.0 | Up to the standard | |||
Hexavalent chromium | ND | 1.5 | Up to the standard | |||
Total arsenic | ND | 0.5 | Up to the standard | |||
Sampling time | June 19, 2023 | |||||
Detection point | Noise | South factory | ||||
Nighttime | Daytime | |||||
Factory boundary South | 47(Industrial noise) | 56(Domestic noise) | ||||
Factory boundary West | 44(Environmental noise) | 52(Environmental noise) | ||||
Factory boundary North | 45(Environmental noise) | 53(Domestic noise) | ||||
Factory boundary East | 47(Industrial noise) | 56(Industrial noise) | ||||
Sampling time | June 19 - June 20, 2023 | |||||
Detection point | Noise | North factory | ||||
Daytime | Nighttime | |||||
Factory boundary East | 55(Industrial noise) | 46(Industrial noise) | ||||
Factory boundary South | 53(Domestic noise) | 44(Environmental noise) | ||||
Factory boundary West | 56(Industrial noise) | 48(Industrial noise) | ||||
Factory boundary North | 56(Industrial noise) | 46(Industrial noise) |
4. Reasons for not conducting self-monitoring
Monitoring has been carried out
5. Quarterly report on pollution source monitoring
Refer to attachment